The scheme involves recycling of water between the Upper reservoir & lower reservoir and is the first major dam construction in India to use fly ash as a major constituent.It is the largest pumped storage scheme in the state. The scheme envisages 1.5 MUs of daily power generation during peak hours of
demand & pumping of water from lower reservior to upper reservoir during off-peak hours.
Your visitor Number:
1737
Currently active visitors:
1
Best viewed in 100% text-size with:
Windows: IE-6.0+, NS7.0+, Opera 7.21+
Linux: Mozilla1.6+, Konqueror 3.2.2+, Epiphany 1.2.4+